Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 022132.00 | Portland | Signal Improvements and Sidewalk Ramp Reconstruction: In Cumberland County, project is located at five intersections along Congress Street, including High Street, Forest |
Rejected | ||
| 023925.00, 023931.00 | Buxton / Gorham / Hollis / York | Pavement Milling, Ultra-Thin Bonded Wearing Course Overlay, Hot Mix Asphalt Overlay, with Drainage Improvements.
|
Awarded | ||
| PH20190313VM | Regions 1, 2, & 3 | Vegetation Management along State Roadsides:
Awarded to:
|
Awarded | ||
| 018995.32 | Mercer / Norridgewock / Farmington / Strong | Crack Sealing on Routes 4, and US Route 2.
|
Awarded | ||
| 022410.00, 022445.00, 022446.00 | Orrington / Brewer / Old Town | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements:
|
Rejected | ||
| PH023682.00, PH025402.00, PH025446.00, PH025440.00 | Harrington / Dover-Foxcroft / T2 R8 NWP / Eagle Lake | Expansion Joint Armor Fabrication/Delivery locations as listed per Notice to Contractors. |
Awarded | ||
| 024039.00 | Biddeford / Kennebunkport | Cyclical Pavement Resurfacing and Safety Improvements: Located in Kennebunkport, beginning 0.04 miles south of Beachwood Avenue and extending north 6.08 miles to 0.28 mile south of Newton Road in Biddeford. |
Awarded | ||
| 023997.00, 024041.00 | Easton / Fort Fairfield | Hot Mix Asphalt Overlay and Safety Improvements:
|
Awarded | ||
| PH021162.19R2 | Region 2 | Roadside Mowing/Non-Interstate in Region 2, Areas One through Four: Located in the Counties of Androscoggin, Kennebec, Sagadahoc, Somerset, Lincoln, Knox and Waldo. Awarded to:
|
Awarded | ||
| PH023871.19P4 | Region 4 | Pavement Marking & Stenciling in various locations in Hancock, Penobscot and Washington Counties. |
Awarded | ||
| 022468.00 | Searsport / Stockton Springs | Pavement Milling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements.: Located in Searsport on US Route 1, beginning 0.50-mile northeast of Trundy Road and extending 4.38 miles ending in Stockton Springs. |
Awarded | ||
| 022288.00, 022306.00, 022308.00, 022374.00 | Bingham / Fairfield / Waterville | Bridge Paint Projects:
|
Awarded | ||
| 023999.00, 024017.00 | Topsfield / Lee / Springfield | Cyclical Pavement Resurfacing and Safety Improvements:
|
Awarded | ||
| PH021162.19R3 | Region 3 | Roadside Mowing/Non-Interstate in Region 3 areas, East and West. |
Awarded | ||
| PH20190306ASA | Region 2 | Add Shoulder Aggregate to Existing Shoulders. |
Awarded | ||
| 024027.00 | Benton / Unity / Unity Township | Pavement Milling, Cyclical Pavement Resurfacing and Safety Improvements: Located in Unity, beginning at the intersection of Route 9/202 and Route 139 and extends westerly 7.00 miles on Route 139, through Unity Township, then ending in Benton. |
Awarded | ||
| 022478.00, 022478.10 | Yarmouth | Pavement Milling and Hot Mix Asphalt Overlay:
|
Awarded | ||
| 025744.01, 025744.02A, 025744.02B, 025744.03A, 025744.03B, 025744.04A, 025744.04B, 025744.05A, 025744.05B, 025744.05C, 025744.05D | Statewide | Excavators/Supply Excavators without operator for seasonal use by the Department:
|
Awarded | ||
| PH021162.19R4 | Region 4 | Roadside Mowing/Non-Interstate in the Region 4 Areas in Enfield, Guilford, Orland & Eddington Crew Areas. |
Awarded | ||
| 022488.00C, 023482.00C, 023855.00C, 022492.00C | Lyman / Lang TWP. / Kingfield / Topsfield | Crushing:
Awarded to:
|
Awarded | ||
| PH023871.19P123 | Regions 1, 2, & 3 | Pavement Marking & Stenciling: |
Awarded | ||
| 023927.00 | North Berwick / Wells | Pavement Milling, Ultra-Thin Bonded Wearing Course Overlay, with Drainage and Safety Improvements, located on Route 9:
|
Awarded | ||
| 024079.00 | Hollis | Cyclical Pavement Resurfacing on Route 117, beginning at US Route 202 and extending northwesterly 5.40 miles to Waterboro Road. |
Awarded | ||
| 022438.00, 022448.00, 022956.00, 024025.00 | Norway / Paris / West Paris | Pavement Milling, Ultra-Thin Bonded Wearing Course Overlay, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements:
|
Awarded | ||
| 021682.00 | Caribou | Drainage Improvements: Located on Route 89 (High Street), beginning at the intersection of Main Street and High Street and extending easterly 0.35 mile. |
Awarded | ||
| 022470.00 | Herseytown TWP / Sherman / Crystal / Island Falls / Dyer Brook / Oakfield / Smyrna / Ludlow / New Limerick / Houlton | Pavement Milling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements: Located on Interstate 95 Northbound, beginning at the T1 R6-Herseytown TWP town line and extending north 48.89 miles to the Canadian border. |
Awarded | ||
| 023933.00 | Manchester / Winthrop | Pavement Milling, Ultra Thin Bonded Course Overlay with Safety Improvements, located on US Route 202, divided into two sections:
|
Awarded | ||
| 024081.00 | Baldwin / Cornish / Hiram | Cyclical Pavement Resurfacing: Located on Route 5, beginning in Cornish 0.19 mile south of the Baldwin town line and extending northerly 5.99 miles to Route 117 in Hiram. |
Awarded | ||
| 023937.00, 023939.00, 023941.00 | Fairfield / Norridgewock / Skowhegan | Pavement Milling, Ultra-Thin Bonded Wearing Course Overlay with Drainage and Safety Improvements:
|
Awarded | ||
| PH20190227EAD | Statewide | On Call Excavators and Dozers - Equipment Rental with an Operator. |
Opened |
