Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| PH021162.19MA | Washington | Supply and Delivery of Apron Motor Assembly: Delivered to the Town of Washington, MDOT Maintenance Lot. |
Awarded | ||
| PH20190703PL5 | Region 5 | On Call Plumbing Services. |
Rejected | ||
| 024584.00 | Waterford | Culvert Replacement on Route 35, just North of the Bridgton town line in Waterford. |
Awarded | ||
| 023795.00R | West Bath | Twin Culvert Replacement on Berrys Mill Road, 0.2 miles south of the intersection of Austin Road. |
Awarded | ||
| 024452.00 | Washburn / Castle Hill | Culvert Replacements on the Parsons Road in Washburn and on Route 227 in Castle Hill. |
Awarded | ||
| 022829.00 | Benton-Region 2 | Traffic Signal Modifications at the Intersection of Bridge Street/Neck Road, with Benton Avenue/River Road. |
Awarded | ||
| 022930.00 | Monson | Large Culvert Replacement on Routes 6/15, approximately 0.4 mile southerly of the Shirley town line. |
Awarded | ||
| PH20190619AC4 | Region 4 | HVAC Preventative Maintenance & Repair Work. |
Awarded | ||
| 018811.00 | Brunswick | Large Culvert Replacement: Located on Route 9, approximately 0.04 mile easterly of Bay Bridge Road. |
Awarded | ||
| 026024.00 | Caribou | Catch Basin Replacements, beginning at 0.01-mile East of the intersection of Meadowbrook Drive and Route 164. |
Awarded | ||
| 023484.00, 023823.00 | Islesboro / Vinalhaven | Fender System Modifications:
|
Awarded | ||
| 025048.00 | Concord Township | Culvert Replacement on Route 16, in Concord Twp. |
Awarded | ||
| PH20190619MR4 | Region 4 | Roadside Mowing Non-Interstate. Located at the Hancock, Bangor, and Plymouth Crew Areas. Awarded to:
|
Awarded | ||
| 025882.00 | Bridgton | Dome Repairs at the MaineDOT lots in Bridgton,720 Portland Road. |
Awarded | ||
| 025638.00 | Farmington / Strong | Canopy Clearing, along Route 149, from Farmington to Strong. |
Rejected | ||
| 025332.00 | Millinocket / T3 Indian Purchase Township | Culvert Replacement and Ditching: Beginning 0.25 mile south of the intersection of the Golden Road and Route 11 in Millinocket and extending southernly for 2.02 miles along Route 11 into T3 Indian Purchase TWP. |
Awarded | ||
| PH20190605AC5 | Region 5 | HVAC Preventative Maintenance & Repair Work: Various locations in the Counties of Washington, Penobscot and Aroostook. |
Rejected | ||
| 008995.19 | Brunswick / Sidney / Medway | Continuous Count Station Installations:
|
Rejected | ||
| 024498.00 | Paris | Drainage Improvements on High Street. |
Rejected | ||
| 022372.00 | Waterford | Horrs Bridge Deck Replacement: Located on Valley Road/Route 35 over Crooked River, approximately 0.34 of a mile southeasterly of Albany Township. |
Awarded | ||
| 018879.00 | Brunswick | Crosswalk and Ramp Improvements: Located at four various sites, as shown on the plans. |
Awarded | ||
| 022849.00 | Danforth | Large Culvert Replacement on US. Route 1, at South Crooked Bridge. |
Rejected | ||
| PH20190515PD5 | Region 5 | On Call Pumping and Drainage Services: Various locations in the counties of Washington, Penobscot and Aroostook. Awarded to :
|
Awarded | ||
| 022899.00 | Masardis | Large Culvert Rehabilitation on Route 11, approximately 0.5 mile northerly of the Garfield Road. |
Awarded | ||
| 024319.00, 024319.55 | Kossuth TWP / Topsfield | Base Reconstruction:
|
Awarded | ||
| PH20190515ITS | Statewide | On Call Intelligent Transportation Systems Operations and Repair Work, Statewide. Awarded on August 23, 2019, to:
Awarded on October 1, 2019, to:
|
Awarded | ||
| 022488.56C, 022488.56D | Strong / Kingfield / Lang | Trucking in Franklin County. Awarded to:
|
Awarded | ||
| 023762.00, 024378.00 | Rockwood / West Forks | Fabric Storage Building: Located at the MaineDot Maintenance Camps at 3638 Rockwood Road, Rockwood, and 3108 US Route 2, West Forks. |
Awarded | ||
| 023795.00 | West Bath | Culvert Slipline on Berry's Mill Road, in West Bath. |
Opened | ||
| 018754.10 | Eliot | Wildlife Fence: Located on Route 236. |
Awarded |
