Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 024478.00 | Dixfield | Demolition at 547 Main Street in Dixfield. |
Awarded | ||
| 022292.00 | Canton | Childs Brook Number 4 Bridge Culvert Rehabilitation: Located on Route 108/Pleasant Street over Childs Brook, approximately 0.75 of a mile northerly of Route 140. |
Awarded | ||
| 026209.00 | Richmond | Culvert Replacement on Route 197, west of Route 201 in Richmond. |
Awarded | ||
| 024213.00 | Bangor / Falmouth / Freeport / Richmond / Sidney / Etna | Statewide Roadway Weather Information Systems: Located on I-95 and I-295 at six various locations, as shown in the Bid Documents. |
Awarded | ||
| 021162.19, 021162.19D, 021162.19L, 021162.19N, 021162.19P | Regions 1, 2, 3, & 4 | Seasonal Backhoe/Loaders and Loaders: Supply Backhoe/Loaders & Loaders, without operator, for seasonal use by the Department. Awarded to:
|
Awarded | ||
| 021707.00 | Vinalhaven | Lanes Island Bridge Rehabilitation: Located on Lanes Island Road, approximately 0.06 mile southerly of Round The Mountain road junction. |
Rejected | ||
| 023775.01 | Shirley | Roadside Improvements: Located on Routes 6/15, beginning 0.07 mile southerly of Old Route 15 (Loop Road northerly intersection) and extends southerly 0.06 mile. |
Rejected | ||
| PH20190821BRO | Belgrade / Rome / Oakland | Snow Plowing and Ice Control on Routes 27 & 11. |
Rejected | ||
| 022322.00 | Lewiston | Hart Brook Bridge Culvert Rehabilitation: Located on Pleasant Street over Hart Brook, approximately 0.02 of a mile southerly of Alfred A Plourd Parkway. |
Awarded | ||
| 025762.00 | Houlton | Bridge Wearing Surface Replacement: Located 0.10 of a mile north of the intersection of Pleasant Street and Highland Avenue in Houlton and extending north for 0.08 miles along Highland Avenue. |
Rejected | ||
| 022926.00 | Mercer | Flashing Beacons at the intersection of Route 2 and Beech Hill Road. |
Awarded | ||
| 026000.00 | Sanford | Concrete Wearing Surface Replacement: Located on Linscott Bridge on New Dam Road over the Mousam River. |
Awarded | ||
| PH024233.00 | Statewide | Supply and Delivery of Rapid Flashing Beacons: Delivered to the MaineDOT Sign Shop at 66 Industrial Drive in Augusta. |
Awarded | ||
| PH20190814GSD | Statewide | Statewide Geotechnical Drilling in various locations, Statewide. Awarded Region 1-5 to:
|
Awarded | ||
| PH20190807SPV | Vassalboro | Snow Plowing and Ice Control: Located on U.S. Route 201 in Vassalboro, beginning at the Augusta town line (RLM 36.70) and extending in a northerly direction to the Winslow town line (RLM 45.78), for a total distance of 9.08 centerline miles (18.28 Lane Miles). |
Rejected | ||
| 023703.00 | Plymouth | Large Culvert Replacement: Located on Route 69 (Etna Road) in Plymouth, culvert is located .03 of a mile southwest of the Twitchell Road. |
Awarded | ||
| 023486.00 | Penobscot / Aroostook Counties | Railroad Bridge Rehabilitations: Located at various locations along the Maine Northern Railroad line, as shown on the bid documents. |
Awarded | ||
| PH025110.00LCT | Sherman / Amity / Hancock / Bangor / Kingfield / Mercer / Randolph / Freeport / Lebanon | Supply and Delivery of Liquid Chloride Tanks: Delivered to MaineDOT Maintenance Lots located in the city/towns of Sherman, Amity, Hancock, Bangor, Kingfield, Mercer, Randolph, Freeport & Lebanon. |
Awarded | ||
| 024213.00 | Bangor / Falmouth / Freeport / Richmond / Sidney / Etna | Statewide Roadway Weather Information Systems: Located on I-95 and I-295 at six various locations, as shown in the Bid Documents. |
Rejected | ||
| PH018501.19 | Region 2 | Interstate Hydroseeding: Located in Kennebec and Somerset Counties on I-95 from Exit 109, Augusta to exit 127, Waterville. |
Awarded | ||
| 025230.00 | Searsport | Modular Office Building: located at the Searsport Maintenance Camp, at 290 East Main Street. |
Awarded | ||
| PH20190717PTR | Topsham | Snow Plowing and Ice Control: Located: Section No. R1/2-17-201P4: On U.S. Route 201 in Topsham, beginning at the Junction of Old Augusta Road (RLM 1.97) and extending in a northerly direction to the junction of Route 197 in Richmond (RLM 14.08), for a total distance of 12.11 centerline miles (24.22 Lane Miles). |
Awarded | ||
| 025560.00 | Andover | Guardrail Replacement on Route 5 and Route 120, in Andover. |
Awarded | ||
| 025562.00 | Lexington Township / Highland Plantation | Guardrail Replacement on the Long Falls Dam Road in the Township of Lexington and the Plantation of Highland. |
Awarded | ||
| 018964.00 | Gardiner | Rolling Dam 2 Bridge Culvert Rehabilitation: Located on Route 24/River Avenue over Rolling Dam Stream, approximately 3.0 miles northerly of Farmingdale town line. |
Awarded | ||
| 024596.00 | Lincoln | Slope Stabilization with Concrete Pipe Repairs: Located on the River Road (Route 116), about 0.25 miles Northwest of the intersection of Route 2 in Lincoln. |
Awarded | ||
| 025232.00 | China / Edgecomb | Concrete Building Slabs. Located in:
|
Awarded | ||
| 025626.00, 025994.00, 025996.00 | Lebanon / Biddeford | Bridge Wearing Surface Replacements:
|
Awarded | ||
| PH20190703FBP | Freeport / Brunswick | Snow Plowing and Ice Control: Section No. R1-17-1P3: On U.S. Route 1 in Freeport, beginning at the Compact Urban Line (RLM 68.41) and extending in a northerly direction to the junction of Pleasant Street in Brunswick (RLM 73.93), for a total distance of 5.45 centerline miles (10.9 Lane Miles). |
Rejected | ||
| PH021162.19MA | Washington | Supply and Delivery of Apron Motor Assembly: Delivered to the Town of Washington, MDOT Maintenance Lot. |
Awarded |
