Archived Bid Opportunities

Bid Date WIN(s) Municipality Summary Status Date posted
026824.00 Lubec

Creation of a New Breakwater, Boat Launch, Parking Lot off of Route 189 (135 Maine Street).

Awarded
029674.00 Porter

HMA Overlay, Pavement Milling, and Drainage Improvements in the Town of Porter.

Awarded
026808.30 Boothbay Harbor

Drainage Improvements in the Town of Boothbay Harbor.

Located on Route 27 beginning 0.34 mile northeast of Lakeside Drive and extending northeast 0.95 mile.

Awarded
030727.00 Litchfield

Bridge Improvements on Buker Bridge #2035 in the Town of Litchfield.

All bids rejected on May 21, 2026

Rejected
026300.00 & 026500.00 Norridgewock

Pedestrian Safety and Access Improvements to Sidewalk Crosswalk Network on Route 2 Throughout the Village Area as well as Mill and Overlay to Route 2/Route 201A in the Town of Norridgewock.

Award to Ranger Construction Corporation of Fairfield, ME on May 12, 2026.

Awarded
027224.00 Industry

Large Culvert Replacement in the Town of Industry.

Awarded to GCA Construction of Avon, ME on June 23, 2026

Awarded
027666.00 & 027678.00 Bowdoin, Bowdoinham, Litchfield, & Richmond

Full Depth Reclamation in the Towns of Bowdoin, Bowdoinham, Litchfield, and Richmond.

Awarded to All States Asphalt of Richmond, ME on May 12, 2026.

Awarded
030171.00 Bridgton

Bridge Wearing Surface Replacement in the Town of Bridgton.

Awarded
020581.26B Augusta

Front Mounted Mobile Retro-Reflectometer in the City of Augusta

Gamma Scientific DBA UDT Instruments RoadVista of San Diego, CA on June 11, 2026.

Awarded
030497.11, 030499.11, 031107.03, 031162.06 Region 5

Skid Steer, Multi-Year in Region 5.

Opened
029178.00 Alfred & Sanford

Large Culvert Rehabilitation in the Town of Alfred and the City of Sanford.

Project is located on Route 4, 0.29 mile north of Grammar Road.

Awarded to Vortex Services of Livermore, ME on May 12, 2026

Awarded
LAP029662.00 Southwest Harbor

Harbor Floats in the town of Southwest Harbor

This is a Locally Administered Contract

 

Opened
028480.00 Brewer

Intersection Improvements with Mast Arm Replacements

Awarded to Frazier Signal Technologies, LLC of Bangor, ME on May 12, 2026

Awarded
PH20260325MSFS Rockland, Swans Island, Tremont (Bass Harbor), Lincolnville, Islesboro, North Haven, Matinicus, Frenchboro, and Vinalhaven

On Call MSFS Vessel Maintenance, Repair and Refurbishment

Awarded to:

Rockland Marine of Rockland, Maine. The contract was signed on May 12, 2026.

Portland Shipyard of Portland, Maine. The contract was signed on May 26, 2026.

Horn Blower Shipyard of Bridgeport, CT. The contract was signed on May 26, 2026.

Safe Harbor Front Street of Belfast, Maine. The contract was signed on June 29, 2026

Awarded
030773.00 Sidney

Instream Culvert Replacement

Awarded to Pratt & Sons Inc. of Mechanic Fall Maine on May 7, 2026.

Awarded
023871.26D Regions 1, 2, 3, 4, and 5

Regions 1, 2, 3, 4, and 5 On Call Pavement Markings

Awarded to K5 Corporation of Rockland, Massachusetts on May 21, 2026

Awarded to On-The Line Inc. of Bangor, Maine on May 21, 2026

Awarded to L&D Safety Marking Corp of Barre, Vermont on May 21, 2026

Awarded
029426.00 Cambridge-Harmony

Cyclical Pavement Resurfacing

Awarded to Gordon Contracting of Sangerville, ME on April 29, 2026.

Awarded
028132.00 & 031001.00 Presque Isle

Bridge Work, Pavement Milling, Hot Mix Asphalt Overlay, Drainage and Safety Improvements.

Awarded Soderberg Company Inc. of Caribou, ME on April 28, 2026

Awarded
018769.26 Benton, Brunswick, Burnham, Clinton, Fairfield, Newport, Oakland, Palmyra, Pittsfield, West Bath, Cities of Bath, and Waterville

Paint striping in Benton, Brunswick, Burnham, Clinton, Fairfield, Newport, Oakland, Palmyra, Pittsfield, West Bath, Cities of Bath, and Waterville

Awarded
029528.00 Waterville - Winslow

Donald V. Carter Bridge Wearing Surface Replacement

Awarded to Gordon Contracting of Sangerville, ME on April 29, 2026.

Awarded
029484.00 Bangor - Brewer

Request For Statement of Interest: Bangor - Brewer I-395 Bridges

Deadline for Design-Builders to Submit Questions on RFSOI is March 18, 2026 at 3:00 PM EST

Deadline for Design-Builders to Submit SOI is April 14, 2026 at 3:00 PM EDT

Project Documents

Note: The Construction Completion Date has been changed to June 30, 2032

 

Opened
028382.00, 028386.00 Bath and West Bath

Bridge Painting: Bath, Centre Street Connection Bridge (No. 6142); West Bath, New Meadows Road Bridge (No. 6145)

All Bids Rejected on June 1, 2026

Rejected
029488.00a Millinocket, Mattawamkeag

Railroad Turnouts - Furnish and Deliver 4 complete railroad turnout packages in Millinocket and Mattawamkeag

Awarded to Progress Rail Services of Albertville, AL on May 4, 2026

Awarded
030497.12, 030499.12, 031107.04 Augusta

Loader Rental without Operator, Multi-Year in Fleet Services Augusta

Opened
029488.00d Brownville - Millinocket

Supplying, stockpiling and loading Type 4 stone ballast into railroad cars provided by EMR

Awarded to Steelstone Industries of Houlton, ME on April 23, 2026

Awarded
025449.00 Newcastle

Meadow Brook Bridge Replacement

Awarded to Wyman & Simpson of Richmond, ME on April 23, 2026

Awarded
018995.19, 030287.00 Region 1

Region 1 Crack Sealing

Awarded to Sealcoating Inc of Braintree, MA on June 9, 2026

Awarded
029488.00b Brownville - Millinocket

Brownville to Millinocket, Furnishing and delivering a package of other track materials consisting of stick rail, joint bars, compromise joint bars, track bolts, tie plates, rail anchors and rail spikes at various locations on the EMR line.

Awarded to A & K Railroad Materials of Moon TWP, PA

Awarded
028384.00 Arrowsic and Woolwich

Max L. Wilder Memorial Bridge Painting

Awarded to Royal Bridge, INC. of Palm Harbor, FL on June 1, 2026

Awarded
028378.00, 028412.00 Hampden and Plymouth

Bridge Painting: Hampden, Cold Brook Road/Interstate 95 Bridge (No. 5970); Plymouth, State Route 7/Interstate 95 Bridge (No. 5960)

Awarded to Royal Bridge, Inc. of Palm Harbor, FL on June 9, 2026

Awarded